with 477.50534.5057.00 1.18 6.79 501 1.32

and 636.50707.0070.50 0.91 3.58 303 0.99

CS6000 1040.01388.0348.000.62 3.42 4379 1.18

0 0

includi1080.51341.5261.000.70 2.99 5521 1.39

ng 0 0

116+50 GS-21-1DS5 726.001290.0564.000.96 8.45 244 1.09

NE 19 0

includi861.001057.5196.501.62 10.31153 1.76

ng 0

* Bohrloch wegen extremer Abweichung abgebrochen und als Bohrloch GS-21-116 erneut gebohrt

- Alle Testwerte sind ungeschnitten und die Intervalle spiegeln die gebohrten Schnittlängen wider.

- Kernproben mit HQ- und NQ2-Durchmesser wurden in zwei Hälften gesägt und typischerweise in Standardintervallen von 1,5 Metern entnommen.

- Die folgenden Metallpreise wurden zur Berechnung des Au Eq-Metallgehalts verwendet: Gold 1625 USD / Unze, Ag: 19 USD / Unze, Cu: 2,80 USD / Pfund. Verwendete Formel zur Berechnunge der AuEq g/t = (Au g/t) + (Ag g/t × 0,01169) + (Cu% × 1,1815). Alle Metalle werden in USD angegeben und Berechnungen berücksichtigen keine Metallrückgewinnung. (metal recoveries).

- Die tatsächlichen Breiten (true widths) wurden nicht bestimmt, da der mineralisierte Körper in alle Richtungen offen bleibt. Weitere Bohrungen sind erforderlich, um die Ausrichtung des mineralisierten Körpers und die tatsächlichen Breiten zu bestimmen.

Tabelle 2: Bohrdaten für die Bohrlöcher in der Pressemitteilung vom 27. September 2021

Section Hole ID UTM E UTM N ElevatioAzi Dip Depth

NAD NAD n (?) (?) (m)

83 83 (m)

111+00 EK-21-01429775.96272171.1380.5 312 -50 299

NE 8

114+50 GS-21-11428656.96273199.1370.9 292 -65 215.8

NE 4 7

114+50 GS-21-11428656.96273199.1370.9 295 -64 1529

NE 6 7

116+50 GS-21-11429068.66273270.1222.1 295 -85 1290

NE 9 3

Tudor Gold Corp und unsere verbundenen Serviceunternehmen haben extreme Maßnahmen ergriffen, um die höchsten professionellen Standards aufrechtzuerhalten, während sie im Rahmen der COVID-19-Gesundheits- und Sicherheitsprotokolle arbeiten. Nur wesentliches Personal darf das Camp und die Bereitstellungsbereiche betreten. Von denen Personen, die sich am Projekt- und Bereitstellungsort befinden, haben wir eine strenge tägliche Überwachung der Körpertemperaturen und des allgemeinen Gesundheitszustands durchgeführt. Wir haben einen zertifizierten Sanitäter im Bereitstellungsbereich, der alle ein- und ausgehenden Tudor-Mitarbeiter sowie alle Dienstleister untersucht.

Qualifizierte Person

Die qualifizierte Person für diese Pressemitteilung im Sinne des National Instrument 43-101 ist der Vizepräsident für Exploration und Projektentwicklung des Unternehmens, Ken Konkin, P.Geo. Er hat die wissenschaftlichen und technischen Informationen gelesen und genehmigt, die die Grundlage für die Offenlegung in dieser Pressemitteilung bilden.

QA / QC

Bohrkernproben wurden im Vorbereitungslabor von MSA Labs in Terrace, BC, hergestellt und im geochemischen Labor von MSA Labs in Langley, BC, getestet. Die analytische Genauigkeit und Präzision wird überwacht, indem vom Personal von Tudor Gold in regelmäßigen Abständen Rohlinge, zertifizierte Standards und doppelte Proben in den Probenstrom eingefügt werden. Das Qualitätssystem von MSA Laboratories entspricht den Anforderungen der internationalen Standards ISO 17025 und ISO 9001. MSA Labs ist unabhängig vom Unternehmen.

Über Tudor Gold

Tudor Gold ist ein Edelmetall- und Basismetall-Explorationsunternehmen mit Konzessionsflächen im ,Goldenen Dreieck' von British Columbia, einem Gebiet, in dem produzierende bzw. in der Vergangenheit produzierende Minen sowie mehrere großen Lagerstätten, die sich einer möglichen Erschließung nähern. Das 17.913 Hektar große Treaty Creek Projekt (an dem Tudor Gold zu 60% beteiligt ist) grenzt im Südwesten an das KSM-Grundstück von Seabridge Gold Inc. und im Südosten an das Brucejack-Grundstück von Pretium Resources Inc.

Im April 2021 veröffentlichte Tudor seinen technischen Bericht 43-101 "Technical Report and Initial Mineral Resource Estimate of the Treaty Creek Gold Property, Skeena Mining Division, British Columbia Canada" vom 1. März 2021 auf dem Sedar-Profil des Unternehmens. Das Unternehmen besitzt außerdem eine 100-prozentige Beteiligung am Crown-Projekt und eine 100-prozentige Beteiligung am Eskay-North-Projekt, die sich alle im Gebiet Golden Triangle befinden.

IM NAMEN DER BOARD OF DIRECTORS VON TUDOR GOLD CORP.

"Walter Storm"

Walter Storm.

Präsident and Chief Executive Officer

Für weitere Informationen besuchen Sie bitte die Website des Unternehmens unter www.tudor-gold.com oder wenden Sie sich an:

Chris Curran

Head of Corporate Development and Communications

Telefon: +1 (604) 559 8092

E-Mail: chris.curran@tudor-gold.com

oder

Carsten Ringler

Head of Investor Relations and Communications

Telefon: +49 151 55362000

E-Mail: carsten.ringler@tudor-gold.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statements regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including the completion and anticipated results of planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connation thereof.

Such forward-looking information and statements are based on numerous assumptions, including among others, that the Company's planned exploration activities will be completed in a timely manner. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate.

There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's plans or expectations include risks relating to the actual results of current exploration activities, fluctuating gold prices, possibility of equipment breakdowns and delays, exploration cost overruns, availability of capital and financing, general economic, market or business conditions, regulatory changes, timeliness of government or regulatory approvals and other risks detailed herein and from time to time in the filings made by the Company with securities regulators.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.

The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.

Die Ausgangssprache (in der Regel Englisch), in der der Originaltext veröffentlicht wird, ist die offizielle, autorisierte und rechtsgültige Version. Diese Übersetzung wird zur besseren Verständigung mitgeliefert. Die deutschsprachige Fassung kann gekürzt oder zusammengefasst sein. Es wird keine Verantwortung oder Haftung: für den Inhalt, für die Richtigkeit, der Angemessenheit oder der Genauigkeit dieser Übersetzung übernommen. Aus Sicht des Übersetzers stellt die Meldung keine Kauf- oder Verkaufsempfehlung dar! Bitte beachten Sie die englische Originalmeldung auf www.sedar.com, www.sec.gov, www.asx.com.au/ oder auf der Firmenwebsite!

https://www.irw-press.at/prcom/images/messages/2021/61698/Tudor_280921_DEPRcom.001.jpeg

https://www.irw-press.at/prcom/images/messages/2021/61698/Tudor_280921_DEPRcom.002.jpeg

https://www.irw-press.at/prcom/images/messages/2021/61698/Tudor_280921_DEPRcom.003.jpeg

https://www.irw-press.at/prcom/images/messages/2021/61698/Tudor_280921_DEPRcom.004.jpeg

https://www.irw-press.at/prcom/images/messages/2021/61698/Tudor_280921_DEPRcom.005.jpeg

Die englische Originalmeldung finden Sie unter folgendem Link:

https://www.irw-press.at/press_html.aspx?messageID=61698

Die übersetzte Meldung finden Sie unter folgendem Link:

https://www.irw-press.at/press_html.aspx?messageID=61698&tr=1

NEWSLETTER REGISTRIERUNG:

Aktuelle Pressemeldungen dieses Unternehmens direkt in Ihr Postfach:

(MORE TO FOLLOW) Dow Jones Newswires

September 28, 2021 05:01 ET (09:01 GMT)